Mining Laboratory equipment
Home  > PRODUCTS  > Mining Laboratory equipment  > 

SX2-2.5-10 muffle furnace [1000℃]

这里可以自定义设置
SX2-2.5-10 muffle furnace [1000℃]
SX2-2.5-10 muffle furnace [1000℃]
The electric furnace has a rectangular shape and is made of angle steel plate. The working chamber is made of silicon carbide or high-aluminum material. The heating element is wound in the furnace with high-temperature resistance wire. The light brick or silicon cotton felt is used as insulation material. Equipment to form a complete set of equipment.
B站不支持收货地址
B站不支持库存规格
MOQ:
1 set
Place of Origin:
China
Quality:
High level
Warranty:
12 Months
Lead time:
20-55 days after receiving prepayment.
Service:
OEM service
Payment:
T/T, LC
Color:
Customizable
Installation and adjustment:
Provide
Operation training:
Provide
参数暂无数据
多属性暂无数据
B站不支持优惠卷

Add success, do you want to check your shopping cart?

暂无分享
B站不支持产品保障

The electric furnace has a rectangular shape and is made of angle steel plate. The working chamber is made of silicon carbide or high-aluminum material. The heating element is wound in the furnace with high-temperature resistance wire. The light brick or silicon cotton felt is used as insulation material. Equipment to form a complete set of equipment.



                                                                                           The main technical parameters

 


Model DataSX- 2.5-10SX- 2.5-12SX- 4—10SX- 5—12XL-1SX- 8—10SX- 10-12SX- 12—10
rated powerKW2.545481012
Rated voltageV220380/220
Rated maximum temperature°C10001200100012001000100012001000
Heating element connection
In parallelY/A
Empty furnace heating timemiln≤60≤100≤100≤150≤120≤150≤160≤180
Empty furnace power lossKW≤1≤1.6≤1.7≤1.8≤1.7≤2.4≤3.0≤4.5
Furnace size:






longmm200300325400500
widthmm120200200250300
highmm80120125160200
Dimensions:





longmm6007006508501000
Widthmm370465600530655
Highmm450550490625680
With controller
model

KSW-6-12KSW-12-12



Installation

 

Electric furnace system complete equipment, whether the inspection of the open package is complete, whether the controller and the thermocouple are matched, the electric furnace and the controller can be installed on the appropriate ground or workbench according to the situation of the workshop or the laboratory, and at the level, according to the electric furnace And the specification or wiring of the controller is connected with various wires and tightened. The wires connecting the power supply should be selected according to the load standard of the electric furnace current. The thermocouple is inserted into the temperature measuring hole of the electric furnace 20-50 mm, and the thermocouple gap is asbestos. Rope or aluminosilicate padding to reduce heat loss.

 

Usage

 

According to the controller's instructions, adjust the electric furnace to the required temperature for use. The first time or the long time after use, the furnace must be dried to prevent the furnace and the door from shrinking and rupturing.

Drying time: 20-200 8 hours

200-900 10 hours

900-950 2 hours

When drying at about 200, slightly open the furnace door and let go of the moisture in the furnace.

Matters needing attention

1. The ground wire must be installed.

2 Turn off the power when loading materials.

3Alkaline, acidic substances and hydrogen chloride will oxidize the heating elements at high temperatures, which will shorten the service life.

4The liquid is not allowed to overflow on the heating element to avoid burning the heating element.

5 Regularly check the fastening wiring connection screws.

6 It must work in the case where the relative temperature does not exceed 85% and there is no conductive dust and Egyptian explosive gas.

7Keep the inside of the furnace clean.

8Continuous work should be within 12 hours.

9Cracks in the furnace can continue to be used without affecting the overall structure.





 




Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Leave Your Message inputting...